Wednesday, May 12, 2010

Barn Progress

Syd and I went up to the patch on Sunday afternoon to deliver some conduit left over from the Indoor Arena rehab project. Bruce is going to make grills to put between each stall. I hope that the aisle floor will be poured soon! We also staked out temporary pasture on the east side of the driveway. I hope that Brady can get started fairly soon. He did take up a couple loads of T post and a bunch of pressure treated corner posts.







I picked up five gallons of semi transparent stain at RK Miles to be used to stain the barn trim and siding. In my haste I neglected to pick up a couple of brushes. Tomorrow.